PROJECT:   AECOM Maunsell Bassett

Architect:   Bligh Voller Nield

Walton Construction was engaged as builder to fit out levels 8, 9 and 10 for its client, AECOM Maunsell Bassett. The fit out comprised of a public floor (level 9) with client reception, meeting facilities and two large boardrooms as well as office partitioning and informal meeting and layout areas. Levels 8 and 10 are very similar in layout except for subtle differences in materials and colours.

A noteworthy feature of the project is the interconnecting staircase with a striking wire mesh wall and toughened glass balustrade that ties together the three levels.

The steel stringers for the stair had to be supplied in three lengths per floor due to lack of access and capacity of the goods lift. They were then welded together and hoisted into position. Walton Construction encountered and overcame significant structural and logistical challenges during construction, including construction of the company's communications room which was needed four weeks before the completion of the rest of the building.

Project Review Sheet   Download Project Review Sheet

 
 

Melbourne

Fitout and Interiors

Chuan Spa
J.B.Were Stockbrokers
Jones Lang LaSalle
Legislative Chamber
Lonely Planet
Maunsell Bassett
Melbourne IVF
Myer Family Offices
Qantas Corporate Offices
Repatriation Hospital
Victoria Parade Surgery
EPA
 

Construction

10 Yarra Street
606 St Kilda Road
Bialik College
Chisholm Institute of TAFE
Corpus Christie Aged Care
Fairways Aged Care Hostel
Korowa Anglican Girls School
Life Saving Victoria
Melbourne Grammar School
Mentone Grammar School
Ruyton Girls School
Sorrento Golf Club
Swinburne University
 
 
 

 

 

px
footer